P583(CP4E)-T1A CLP Tx Room & LV switchroom |
Airport Authority |
SCL 1111 – Hung Hom North Approach Tunnels – WSD working platform for DAV of watermain at Pipe
Bridge of OB2 |
Gammon Construction Limited |
DC/2013/10 Design, Build and Operate San Wai Sewage Treatment Works – Phase 1 |
ATAL CONSTRUCTION LIMITED |
Main Contract (Phase 2A works) – Proposed Chu Kong New Terminal Facilities, Tuen Mun Town Lot
No.491, New Territory |
Concentric construction Ltd |
CV/2016/08 Queen’s Hill Development – Sewage Pumping Station Works |
China Geo-Engineering Corporation |
HY/2014/08 Central Kowloon Route Yau Ma Tei East |
BK-SK-JV |
Proposed Residential Developement at Inland Lot No. 8949 – 21,23&25 BORRETT ROAD, H K |
CR Construction Company Limited |
WO NO: B7935329
Replace granite slab covers with as tray at Ngau Chi Wan Park, middle and lower
platform |
建築署(ASD) |
Liantang Port Cross – Border |
LEIGHTON CONTRACTORS (ASIA) LIMITED |
HY/2011/08 Construction of tunnel buildings, installation of route-wide electrical and mechanical works and TCSS, and associated works for tunnel commissioning. |
Leighton Joint Venture |